IMAGES

All mooring ropes and spares safely offloaded and placed into storage at Peterhead.

Download JPG (1.88 MB)

November 2014: WIDP subsea bundles fabrication begins

Download JPG (49.6 KB)

Seven Navica vessel at Subsea 7’s spoolbase in Leith

Download JPG (2.08 MB)

September 2014: WIDP mooring rope ready for shipping to Scotland

Download JPG (38.07 KB)

September 2014: End of the production line for the 24 mooring ropes in Portugal

Download JPG (86.75 KB)

September 2014: WIDP mooring rope production line in Portugal

Download JPG (57.65 KB)

May 2014: Seven Navica vessel arrives in to Leith after the successful installation of the WIDP Pipeline

Download JPG (85.27 KB)

Gas export/import pipeline fabrication at Subsea 7, Leith

Download JPG (5.62 MB)

Anchor chain in Bilbao, Spain before mobilisation to Leith

Download JPG (2.65 MB)

Pile anchors in Bilbao, Spain before mobilisation to Leith

Download JPG (1.74 MB)

Gas export/import pipeline, Subsea 7, Leith

Download JPG (4.78 MB)

WI LI-1 subsea tree lifted from Nomad BOP skidding system

Download JPG (2.23 MB)

Tree lowered and skidded beneath rig floor on Nomad carrier

Download JPG (509.71 KB)

ROV footage with tree at depth, final checks being carried out by ROV

Download JPG (85.87 KB)

Installation of LP-4 FFS on Nomad to LP-4 Production subsea tree

Download JPG (354.5 KB)

36" wellhead conductor

Download JPG (2.06 MB)

Water injection and water production trees on vessel for North Drill Centre

Download JPG (1.03 MB)

18 3/4" non-drill thru Wellhead within shipping basket

Download JPG (2.77 MB)

Subsea trees at Dana storage facility

Download JPG (2.17 MB)

Visit to Subsea 7 Wick fabrication site

Download JPG (3.3 MB)

Subsea trees at FMC Technologies

Download JPG (3.66 MB)

Subsea trees at FMC Technologies

Download JPG (3.57 MB)

Subsea trees at FMC Technologies, May 2013

Download JPG (2.09 MB)

Subsea trees at FMC Technologies, June 2013

Download JPG (2.31 MB)

Subsea Christmas trees exit from FMC Technologies, Dunfermline

Download JPG (3.66 MB)

Subsea Christmas trees subsea integration test

Download JPG (2.97 MB)

Subsea Christmas trees subsea integration test

Download JPG (3.52 MB)

Subsea 7 Wick fabrication site

Download JPG (8.74 MB)

Subsea 7 Wick fabrication site temporary launch rails

Download JPG (6.73 MB)

Subsea Isolation Valve Structure (SSIV)

Download JPG (2.22 MB)

SSIV mobilisation

Download JPG (3.96 MB)

SSIV installation

Download JPG (1.68 MB)

Subsea trees at Dana storage facility Advantec

Download JPG (3.92 MB)

Installation of SSIV structure, 26 July 2013

Download JPG (1.55 MB)